top of page

Transpower's 220kV Cable Jointing Project


Introduction

This project involved installing six 220kV XLPE cable joints.

Deliverables

  • Site Jointing Engineer. This included work auditing, quality control, technical co-ordination and preparing a quality report.

  • Writing project Quality Plan

  • Writing procedures for sheath repair, PD sensor installation, 

  • Carrying out x9 PD tests on two 220kV circuits.  Testing all 19 joints / terminations.  Developing plans and reports for these tests.

Benefits

  • Consistent and excellent work practices.

  • Engaged client on all technical decisions.
  • Effective delivery of documentation and technical decisions.
  • Excellent record keeping of work done.
  • Leading edge PD testing gave Transpower confidence to return suspect 220kV cable circuit to service.

Reference

Contact Steve Peake for a reference on 021 244 6568


Vector's maintenance standards development project


Introduction

This project involved developing all Vector's electrical maintenance standards.

Deliverables

  • Developing a standard document template

  • Running workshops to collect feedback

  • Modifying the document for approval

  • Writing the maintenance standards

Benefits

  • Consistent structure, format and writing style implemented across all standards

  • Maintenance activities supported Vector's strategic objectives by mitigating identified asset failure modes.
  • Comprehensive health, safety, environmental, commercial and technical requirements developed
  • Inspection criteria contains well defined asset conditions that trigger specific remedial actions.
  • Information mapping principals applied to make the documents consistent, easy to scan and read
  • Maintenance data specified to support continual improvement and risk management

Reference

Contact the Project Manager, Ashneel Prasaad for a reference on 027 498 7585



Top Energy's maintenance standards development project

Introduction

This project involved developing all Top Energy's electrical maintenance standards.

Deliverables

Do Consulting had the following responsibilities on this project:

  • Developing a standard document template
  • Developing and tracking the projects schedule
  • Writing the maintenance standards
  • Running workshops to collect feedback
  • Modifying the document for approval
  • Running implementation training at the end of the project

Benefits

  • Consistent structure, format and writing style was implemented across all standards
  • Maintenance activities supported Top Energy's strategic objectives by mitigating identified asset failure modes.
  • Comprehensive health, safety, environmental, commercial and technical requirements developed
  • Inspection criteria contains well defined asset conditions that trigger specific remedial actions.
  • Information mapping principals applied to make the documents consistent, easy to scan and read
  • Maintenance data specified to support continual improvement and risk management

Reference

Contact the Project Manager, Evan Graham for a reference on 027 556 6598 or Evan.graham@topenergy.co.nz

bottom of page